Base Building Archives - 91成人 /sector/base-building/ Wed, 18 Feb 2026 19:46:49 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.2 /wp-content/uploads/2025/12/cropped-clune-favicon-32x32.png Base Building Archives - 91成人 /sector/base-building/ 32 32 Metal Recycling Plant Site Improvements /project/metal-recycling-plant-site-improvements/ Tue, 17 Jun 2025 16:38:51 +0000 https://cluneconstruct.wpenginepowered.com/project/metal-recycling-plant-site-improvements/ Construction management services for site improvements to the existing confidential metal recycling yard. Improvements include the excavation and installation of a new 61,000 CF storm detention tank and foundation pad, associated storm piping/catch basins, new structural pads for scrap metal storage, grading improvements to upgrade site drainage and stormwater tie-in to existing Chicago sewer in […]

The post Metal Recycling Plant Site Improvements appeared first on 91成人.

]]>
Construction management services for site improvements to the existing confidential metal recycling yard. Improvements include the excavation and installation of a new 61,000 CF storm detention tank and foundation pad, associated storm piping/catch basins, new structural pads for scrap metal storage, grading improvements to upgrade site drainage and stormwater tie-in to existing Chicago sewer in the right of way. As well as the laying of a 1000-yard concrete pour to accommodate new renovations.

The project involved the integration of a new emission capture and control system designed to improve air quality and operational efficiency, and the installation of a 1,300-square-foot metal shredder. The pre-fabricated structure was installed to meet environmental compliance standards and support sustainable metal processing operations.

The post Metal Recycling Plant Site Improvements appeared first on 91成人.

]]>
La Grange Country Club /project/lagrange-country-club/ Wed, 08 Jun 2022 13:46:37 +0000 https://cluneconstruct.wpenginepowered.com/project/lagrange-country-club/ Construction and site work of an “All Seasons Village” including a pool house, cabana, snack bar, indoor/outdoor hitting stations, heated paddle tennis courts, lap/diving pool, wading pool, splash pad, playground, and parking lots.听 Interior modifications of the existing clubhouse include renovation of the 2nd floor bar, dining and assembly space, main lobby and HVAC upgrades.

The post La Grange Country Club appeared first on 91成人.

]]>
Construction and site work of an “All Seasons Village” including a pool house, cabana, snack bar, indoor/outdoor hitting stations, heated paddle tennis courts, lap/diving pool, wading pool, splash pad, playground, and parking lots.听 Interior modifications of the existing clubhouse include renovation of the 2nd floor bar, dining and assembly space, main lobby and HVAC upgrades.

The post La Grange Country Club appeared first on 91成人.

]]>
200 Park Avenue Lobby /project/200-park/ Sat, 16 Oct 2021 00:07:42 +0000 https://cluneconstruct.wpenginepowered.com/project/200-park/ The iconic MetLife building underwent a major renovation to breathe new life into the massive lobby and concourse level. A new visitor reception lounge with high-end slatted millwork ceilings and walls was added onto the lobby level as well as new Eastside storefronts. New storefronts were featured beneath the refreshed solid bronze transom panels on […]

The post 200 Park Avenue Lobby appeared first on 91成人.

]]>
The iconic MetLife building underwent a major renovation to breathe new life into the massive lobby and concourse level. A new visitor reception lounge with high-end slatted millwork ceilings and walls was added onto the lobby level as well as new Eastside storefronts. New storefronts were featured beneath the refreshed solid bronze transom panels on the concourse level. All of the center retail stores were removed to create an expansive center passage directly through from 45th street to Grand Central. The interior columns are clad in light travertine and the floors will be finished with epoxy terrazzo to modernize the space. The double height central lobby facing Grand Central features an impressive central vestibule with a striking multicolored Albers Mural above. The updated aesthetic of the lobby extends to the 45th street entrance by continuing the new flooring outside and recladding the exterior columns.

The post 200 Park Avenue Lobby appeared first on 91成人.

]]>
UI Labs /project/ui_labs/ Thu, 14 Oct 2021 18:39:33 +0000 https://cluneconstruct.wpenginepowered.com/project/ui_labs/ Adaptive reuse of an existing warehouse facility into a state-of-the-art, 94,000-square-foot Digital Manufacturing and Design Innovation Institute. The new interior space includes open office, team rooms, training / meeting rooms, IT hub, and a manufacturing hub. In addition to the interior fit-out, Clune provided GC services for the modification of portions of the exterior including […]

The post UI Labs appeared first on 91成人.

]]>
Adaptive reuse of an existing warehouse facility into a state-of-the-art, 94,000-square-foot Digital Manufacturing and Design Innovation Institute. The new interior space includes open office, team rooms, training / meeting rooms, IT hub, and a manufacturing hub. In addition to the interior fit-out, Clune provided GC services for the modification of portions of the exterior including new storefront and curtainwall enclosures, an entry canopy addition and select site improvements.

The post UI Labs appeared first on 91成人.

]]>
Watt Plaza /project/watt-plaza/ Thu, 14 Oct 2021 18:10:55 +0000 https://cluneconstruct.wpenginepowered.com/project/watt-plaza/ Award-winning renovation of a 17,000 square-foot lobby that creates a spacious, light-filled, and welcoming experience for a 1980s high-rise office building. With nearly six times as much space as the old lobby, it now features a comfortable lounge, a flexible state-of-the-art conference center, a catering kitchen for events, retail spaces and a new courtyard. The […]

The post Watt Plaza appeared first on 91成人.

]]>
Award-winning renovation of a 17,000 square-foot lobby that creates a spacious, light-filled, and welcoming experience for a 1980s high-rise office building. With nearly six times as much space as the old lobby, it now features a comfortable lounge, a flexible state-of-the-art conference center, a catering kitchen for events, retail spaces and a new courtyard. The roof and building were cut into and structural steel was built back to create the open-air courtyard with new operable glass storefronts creating an indoor/outdoor experience between the lobby and tranquil outdoor space. The renovation also added a secondary pedestrian entryway, which connects to adjacent transit stops.

The post Watt Plaza appeared first on 91成人.

]]>
Hadley Institute /project/hadleyinstitute/ Wed, 13 Oct 2021 13:37:41 +0000 https://cluneconstruct.wpenginepowered.com/project/hadleyinstitute/ Renovation of an existing two-story building and vertical expansion to create a new third floor for the world鈥檚 oldest and largest provider of distance learning for people who are blind or visually impaired. The new floor increased the building’s square footage by nearly 25%. Clune constructed a high tech virtual reality room, installed an elevator […]

The post Hadley Institute appeared first on 91成人.

]]>
Renovation of an existing two-story building and vertical expansion to create a new third floor for the world鈥檚 oldest and largest provider of distance learning for people who are blind or visually impaired. The new floor increased the building’s square footage by nearly 25%. Clune constructed a high tech virtual reality room, installed an elevator and accessible restrooms, expanded the boardroom, and added new conference rooms and common areas for collaboration, community outreach and education. Clune also worked around three separate existing structural systems to update the mechanical, electrical and plumbing systems. Exterior work consists of new masonry veneer on the building fa莽ade, new windows and a new roof.

The post Hadley Institute appeared first on 91成人.

]]>